• Subsidence.
• Visual check that all framing is straight and plumb. • Wall frame member spacing's are adequate with blocking & nogging installed for wall and ceiling linings. • Connection of frame members. • Location of under-slab services • Roof truss/frame is installed, tied down & braced. • If installed, the standard of fascia and gutter installation. • Structural steel members such as columns, beams and lintels checked for support and fixings. • Window and door openings. • Visual check for the installation of a perimeter termite barrier. • Wall frames secured at top/bottom plate. |